Class "A" energy efficient development in Sant Cugat

Sant Cugat del Vallés
Ref: STC - S001
90-145 m2
16-193 m2
rooms
2-4
baths
2
energy
A
425.000-564.000
90-145 m2 16-193 m2 rooms 2-4 baths 2 parking 1 price 425.000-564.000 energy A
The new Sant Cugat Residential development and its privileged situation offers the tranquility of the remote areas of the old town without giving up all services. It also has good communication infrastructure, with direct access to the motorway and tunnels of Vallvidrera. This development is distributed in five buildings surrounded by gardens and wide streets with space offering unbeatable views.

3 and 4 bedroom apartments, including ground floors with garden and upper floors with large terraces, all apartments have 2 bathrooms.
The pavement of these units is real hardwood floor, and the layout is made with the best possible functionality. The common areas are completed with a spacious garden and a swimming pool. Also, parking spaces are available in the complex and can be chosen depending on each apartment size. The owner will be able to choose a parking space with an electrical outlet to charge the car if needed.

The apartments are classified as "A" class energy efficiency, so that all the appliances and installations are made with optimum consumption response. Also the climatic systems, as well as the exterior carpentry and glazing has the best performance in terms of thermal and noise insulation.

Some finishes can be personalized if chosen on time before the buildings are built. There are different packs for alarm system, appliances, kitchen cabinets, pavements, finishes and colors. Nevertheless, the standard options are in the high range of quality and the years of experience and good reputation of this developer guarantee excellent construction parameters and top-notch finishes.

The location is perfect for families attending schools in the area. It is not located in the city center of Sant Cugat so it belongs to a very residential area but very well connected both to the motorways and the Vallvidrera tunnel that leads to Barcelona. There is plenty of green areas in the area and open spaces all over.

The works will be finished by December 2020.

Print Friendly, PDF & Email
Contact us